rss
personal blog
May. 13, 2012
Our minutes
Atiyah

Our minutes

Atiyah

May. 13, 2012

Studio Project 3

We’re starting on SP3 now.

Atiyah

Mar. 1, 2012
Meeting. (Atiyah)

Meeting. (Atiyah)

Mar. 1, 2012
Minutes. (Atiyah)

Minutes. (Atiyah)

Mar. 1, 2012

2nd march timeline (abigail)

** -Things to do: 

>Final pitch presentation*

Mar. 1, 2012

1st March timeline (abigail)

** -Things to do:
 

>Prepare Final pitch presentation
>Do the finishing touches to the webpages
>Prepare things that are needed to be hand in
>Prepare script
>Practice script as a group
>Burn CD to compile our work
>Write max 500 words on what we did throughout the whole project
» things to include: everything (removing thumbnails and initial design draft)

Feb. 29, 2012
The need of Moldova. Finalize by Abigail. (Atiyah)

The need of Moldova. Finalize by Abigail. (Atiyah)

Feb. 29, 2012
Family shelter. Finalize by Abigail. (Atiyah)

Family shelter. Finalize by Abigail. (Atiyah)

Feb. 29, 2012
Homepage design with drop down menu. Finalize by Abigail. (Atiyah)

Homepage design with drop down menu. Finalize by Abigail. (Atiyah)

Feb. 29, 2012
Homepage design. It was finalize by Abigail. (Atiyah)

Homepage design. It was finalize by Abigail. (Atiyah)